We understand Documentation is as important as the equipments, helping the users qualify and validate their systems. Specific attention is called for documenting necessary procedures, tests & certifications, providing systemic proof of compliance while building the system.
We provide all documentation support to enable the users complete their validation dossiers. The entire documentation package consists of:
- Design Qualification (DQ) - a documented review of system design for conformance to operational and regulatory expectations
- Installation Qualification (IQ) - part of final qualification activity, it relates to the detailed design of a system and verifies the installation of equipment and instruments
- Operational Qualification (OQ) - ensure that individual components, instruments, controls and the system as whole operate on-site as designed
These documents includes:
- Drawings pre-construction & as built
- Piping drawings
- Weld Maps
- Inspection reports
- Calibration reports
- Manufacturer's certificates
- Owner's Instruction Manuals
- Operators Bill of Materials - Mechanical and Electrical
Factory and Site Acceptance Testing
Factory Acceptance Testing of systems at our dedicated testing facility, assist users to get acclimatized to the system before it reaches site also providing close to real conditions while testing.
Factory Acceptance Testing (FAT) includes:
- Dry FAT
- Mechanical Acceptance Test (MAT)
- Electrical Acceptance Test (EAT)
- Functional Evaluation Test (FET)
- Production Data Report (PDR)
Various Utilities may be required while conducting FAT. Some of these can be met with our present infrastructure. Specific project testing demands are analyzed together with our clients prior to signing a contract. |